翻訳と辞書
Words near each other
・ Line (electrical engineering)
・ Line (formation)
・ Line (geometry)
・ Line (given name)
・ Line (heraldry)
・ Line (ice hockey)
・ Line (play)
・ Line (poetry)
・ Line (singer)
・ Line (text file)
・ Line (unit)
・ Line 1
・ Line 1 (Almaty)
・ Line 1 (Athens Metro)
・ Line 1 (Budapest Metro)
Line 1 (Madrid Metro)
・ Line 1 (Metro Bilbao)
・ Line 1 (Metrovalencia)
・ Line 1 (Metrovia)
・ Line 1 (Mumbai Metro)
・ Line 1 (Mumbai Monorail)
・ Line 1 (Naples Metro)
・ Line 1 (Navi Mumbai Metro)
・ Line 1 (Nizhny Novgorod Metro)
・ Line 1 (Rio de Janeiro)
・ Line 1 (Saint Petersburg Metro)
・ Line 1 (São Paulo Metro)
・ Line 1 Yonge–University
・ Line 1, Beijing Subway
・ Line 1, Chengdu Metro


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Line 1 (Madrid Metro) : ウィキペディア英語版
Line 1 (Madrid Metro)

Line 1 of the Madrid Metro runs entirely underground from Pinar de Chamartín in the north to Valdecarros in the southeast, via Vodafone Sol. Today it has 33 stations (with 60-metre-long platforms) and spans from end to end. When it was initially constructed however, the line contained only 8 stops connecting Cuatro Caminos in the north to the city center at Puerta del Sol. Line 1 marks the start of the Madrid Metro with its inauguration on October 17th, 1919 and public service beginning 14 days later on October 31st.〔(【引用サイトリンク】title=History 1919 )〕 There have been various extensions to the line since it opened including the most recent northern extension to Pinar de Chamartin on April 11th, 2007 and a southern extension on 16 May 2007 to Valdecarros.
==History==
Line 1 of the Madrid Metro was opened on 17 September 1919 between Cuatro Caminos and Sol. It was extended from Sol to in 1921, Atocha to in 1923, Cuatro Caminos to in 1929, Tetuán to in 1961 and Puente de Vallecas to in 1962.
Between 1964 and 1966, station platforms were lengthened from 60 metres to 90 metres in order to allow 6-car train compositions, due to heavy increasing passenger flow. Chamberí station had to be closed because it didn't allow platform lengthening due to its sharp curve and its closeness to Iglesia station. The old Chamberí station however is still open to the public as part of the Madrid Metro's project and now functions primarily as a historic exhibition.〔
In recent years, the line has been extended both north and south. On 1 April 1994, it was extended from Portazgo to Miguel Hernández and on 4 March 1999 from Miguel Hernández to Congosto.
In 2007, the line was extended to Pinar de Chamartin in two stages. First, on 30 March 2007, the line was extended from Plaza de Castilla to Chamartin, which provides interchange with Line 10 and RENFE services. The new metro complex has line 1 and in the future, line 11 on the lower level and line 10 on the upper level. On 11 April 2007 the extension to Pinar daae Chamartin was completed. Here, there is interchange available to Line 4. There are two side platforms for arrivals and an island platform for departures. In May 2007, interchange to Metro Ligero 1 was available, which terminates one level higher.
On 16 May 2007, the line was extended south from Congosto to Valdecarros with two intermediate stations.
Since summer 2007, the line uses class 2000B stock. Chamberí station, after more than 40 years of abandonment, was refurbished and open in 2008 as an exhibition place to show how Metro stations were when opened in 1919.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Line 1 (Madrid Metro)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.